Overview of the Supporting Power Transmission Project

The Construction of Supporting Power Transmission Project for Liouesso Hydropower Station in Congo (Rep.), undertaken by WZJ for Délégation Générale Aux Grands Travaux (DGGT), is a significant endeavor aimed at enhancing the energy infrastructure in Congo (Rep.). This article delves into the project’s details, emphasizing its importance and benefits.

Significance for Liouesso Hydropower Station and Congo (Rep.)

The project plays a crucial role in supporting the Liouesso Hydropower Station’s operations and contributes to Congo (Rep.)’s energy security and development.

Details of Transmission Lines and Substations

The scope of work for this project is comprehensive and technologically advanced. It encompasses the construction of vital components, including:

  • A 74.1km 110kV Liouesso-Ouesso transmission line.
  • A 12.85km 30kV Ouesso-Mokeko transmission line.
  • A 71.29km 30kV Owando-Makoua transmission line.
  • 2*10MVA 110/30kV S/S, 2*5MVA 30/20kV S/S, and 2*2.5MVA 30/20kV S/S for effective power distribution.
  • The construction of a 0.4kV line and public lighting infrastructure.

Equipment and Construction Details

The project involves the installation of 110/30kV and 30/20kV substations, along with transmission lines and public lighting infrastructure, utilizing advanced equipment and construction methodologies.

Benefits of the Project

  • Enhanced Power Transmission: The project improves power transmission capabilities, ensuring reliable electricity supply to the Liouesso Hydropower Station and surrounding areas.
  • Infrastructure Development: It contributes to the overall infrastructure development in Congo (Rep.), supporting economic growth and societal progress.
  • Partnership Success: The collaboration between DGGT and WZJ showcases successful project execution and technological expertise.

Overcoming Obstacles

The project encountered challenges such as logistical complexities and technical intricacies. However, strategic planning and innovative solutions enabled successful navigation through these challenges.

Successful Implementation and Handover

Upon completion, the project underwent rigorous testing and commissioning, ensuring operational readiness and seamless integration into Congo (Rep.)’s energy grid.

Conclusion

The Construction of Supporting Power Transmission Project for Liouesso Hydropower Station in Congo (Rep.) represents a significant milestone in enhancing energy infrastructure and promoting sustainable development. The successful collaboration between DGGT and WZJ underscores a commitment to technological advancement and partnership success, paving the way for a brighter energy future in Congo (Rep.).

Website: https://www.wzjelec.com/
Email: rose@sunjelec.com

For further information or inquiries regarding our involvement in this project, please do not hesitate to contact us.
Supporting Power Transmission Project