±800 kV High Voltage DC Transmission Project in India
Project Overview
- Country: India
- Location: Bipole Champa – Kurukshetra
- Type: HVDC
- Voltage: DC ±800kV
- Length: 1407 km
- Finished time: Jan 2015
- Delivery time: Jul 2014
- Supply products: OPGW, Fittings
Introduction:
We are delighted to present an overview of the ±800 kV High Voltage DC Transmission Project in India, connecting Bipole Champa to Kurukshetra. Our company is proud to be a part of this significant venture, responsible for supplying fittings and OPGW (Optical Ground Wire) components. This project aims to enhance the efficiency and reliability of power transmission over long distances in India.
Country and Location:
The project is located in India, a country known for its rapid economic growth and increasing energy demands. The transmission line stretches from Bipole Champa to Kurukshetra, covering a distance of 1407 km. This strategic location allows for the efficient distribution of electricity across different regions.
Project Type: HVDC (High Voltage Direct Current) Transmission
This project utilizes High Voltage Direct Current (HVDC) technology for power transmission. HVDC transmission offers several advantages over traditional AC transmission, including lower transmission losses, increased power transfer capacity, and the ability to transmit power over long distances. By implementing HVDC technology, the project aims to improve the overall efficiency and reliability of the power transmission system.
Project Information:
- Voltage: The transmission line operates at a high voltage of ±800kV. This high voltage level allows for efficient power transmission over long distances, minimizing losses and ensuring reliable electricity supply.
- Length: The transmission line spans a length of 1407 km, making it a crucial infrastructure project in India’s power transmission network. The extended length enables the efficient transfer of electricity from the generation source to the consumption centers.
- Finished Time: The project was completed in January 2015. This showcases the successful execution and timely completion of the high-voltage transmission line, meeting the energy requirements of the region.
- Delivery Time: The delivery of the project components, including fittings and OPGW, was completed in July 2014. Our company played a vital role in ensuring the timely supply of these essential components.
Supply Products: Fittings and OPGW
Our company takes pride in its role as the supplier of fittings and OPGW for this project. Fittings are critical components used in electrical systems to connect, join, or redirect electrical conductors or cables. OPGW, on the other hand, is an Optical Ground Wire that provides both electrical conductivity and optical fiber communication capabilities. By supplying reliable fittings and OPGW, our company contributes to the seamless operation and efficient transmission of electricity in the ±800 kV High Voltage DC Transmission Project.